Building a Kingdom Hall in two days - Oakland CA 1984
Preliminary Site Work - repairing the interior lobby fountain

Before the actual 2-day construction began, there was extensive preliminary site work.
The inside lobby fountain developed some cracks which required some additional grouting work. The brother had to stand on the fountain stones to do the repairs.
Anyone recognize the brother doing the repair?